brandlyhumann.

INDIA D2C ATLAS / EDITION 05 / 19 OCTOBER 2026

The complete
100-point operating guide.

A working reference for planning, launching and operating a consumer brand. Every requirement includes its purpose, actions, record fields and review standard.

This reference contains no customer or project data. Use the interactive atlas for saved records, status tracking, financial checks and project exports. Examples are illustrative; business identity, fees other than the stated consultation fee, policies and credentials must be confirmed by the responsible owner. The local atlas does not provide authenticated cloud collaboration.

Open the interactive operating plan →

Consultation

Define the discussion, preparation and next decisions.

REQUIREMENT 01 / 100 · Rishi / engagement owner

Consultation offer

The visitor should understand the service before opening WhatsApp.

Required actions

  1. Show ₹2,000 and 60 minutes together with Rishi’s name.
  2. Use one consistent description on the home, finance and delivery pages.
  3. Describe the next step as a booking request; payment and confirmation follow separately.
Review standard
All three placements show the same fee, duration and booking destination.

Working record

  • Page / placement
  • Offer wording
  • Last review and issue found

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

The existing CTA opens +91 70240 15382 with a draft request; it does not make a payment.

REQUIREMENT 02 / 100 · Rishi / engagement owner

Consultation placement

Make help available at the point where a founder needs a decision.

Required actions

  1. Keep the home CTA visible beside the introduction.
  2. Place finance help beside the financial model and delivery help beside the execution scope.
  3. Check the button on mobile and confirm that its message describes the relevant discussion.
Review standard
The three required entry points work and their context remains clear.

Working record

  • Placement
  • Customer question at this point
  • Destination and mobile check

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A founder reviewing cash requirements reaches a finance-focused consultation request.

REQUIREMENT 03 / 100 · Rishi / engagement owner

Decisions from the session

Set a useful outcome without promising a complete business plan in one hour.

Required actions

  1. Identify the most important decision before the meeting.
  2. Review the evidence available and distinguish conclusions from assumptions.
  3. Agree the next three actions, their owners and any separate work required.
Review standard
The founder can name the decision to resolve and the information still missing.

Working record

  • Primary decision
  • Evidence available
  • Expected output and exclusions

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Choose whether to test a two-product routine before committing to opening inventory.

REQUIREMENT 04 / 100 · Rishi / engagement owner

60-minute agenda

Use the discussion time for decisions instead of collecting basic background.

Required actions

  1. Reserve 0–10 minutes for context and constraints; 10–25 for the buyer and product.
  2. Use 25–45 for price, costs, cash and route to market.
  3. Use 45–60 for risks, open questions and next actions; adjust the draft agenda to the actual need.
Review standard
The agenda totals 60 minutes and addresses the founder’s main question.

Working record

  • Session objective
  • Agenda changes
  • Decisions reserved for the final 15 minutes

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A running brand may spend the middle block on returns and contribution rather than category selection.

REQUIREMENT 05 / 100 · Rishi / engagement owner

Founder suitability

Clarify what can be discussed at different stages of a business.

Required actions

  1. For an idea-stage founder, review the buyer, category, capital and validation route.
  2. For an existing business, review the D2C offer and operational gaps.
  3. For an operating brand, use actual channel, product and cash records; identify specialist matters separately.
Review standard
The proposed discussion matches the founder’s stage and available evidence.

Working record

  • Founder stage
  • Current challenge
  • Information needed for a useful session

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

An operating brand brings retained sales and spend by channel, not only its revenue screenshot.

REQUIREMENT 06 / 100 · Rishi / engagement owner

Consultation scope

Separate discussion from work that needs research, execution or specialist review.

Required actions

  1. Describe the session as a review of the information supplied.
  2. List exclusions such as supplier verification, formulation, legal opinions, campaign execution and a full financial build.
  3. Record any follow-on work in a separate scope with an owner, output and fee.
Review standard
The founder can distinguish the paid session from an execution engagement.

Working record

  • Included discussion
  • Excluded work
  • Separate engagement required

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A supplier quote can be discussed; an audit or verified factory assessment is separately scoped.

REQUIREMENT 07 / 100 · Rishi / engagement owner

Pre-call questionnaire

Collect enough context to prepare without requesting unnecessary personal data.

Required actions

  1. Ask for category, stage, available capital, intended launch date and up to three questions.
  2. Request an optional website or relevant document reference.
  3. Let the founder review the prepared message before choosing to send it on WhatsApp.
Review standard
The brief is complete enough to prepare and the sender has reviewed what will be shared.

Working record

  • Category and stage
  • Available capital and launch timing
  • Top three questions

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

“Skincare; idea stage; ₹40 lakh available; launch after product checks; need help selecting the first range.”

REQUIREMENT 08 / 100 · Rishi / engagement owner

Documents for review

Use a stage-appropriate evidence pack rather than a generic upload request.

Required actions

  1. For a new brand, collect the brief, interview notes, sample observations and supplier quotations if available.
  2. For a running brand, add SKU costs, channel sales, returns, media spend and a dated cash summary.
  3. Remove passwords and unnecessary customer details; identify missing or outdated documents.
Review standard
Each material document has a date, scope and relevant reference.

Working record

  • Document and version
  • Period / scope covered
  • Missing information or redactions

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Share a summary of delivered and refunded orders by channel, not a full customer database.

REQUIREMENT 09 / 100 · Rishi / engagement owner

Written action note

Make the discussion usable after the call.

Required actions

  1. Record the observations, evidence gaps and decisions actually made.
  2. Write three next actions with owners and dates.
  3. Agree separately whether a written note is included and its delivery timing before accepting payment.
Review standard
A note, when agreed, accurately records the session and identifies unresolved assumptions.

Working record

  • Observations and decisions
  • Open questions
  • Three actions with owner and date

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Action 1: obtain two comparable quotes; action 2: test price; action 3: update the cash case.

Related requirements: 03, 04, 07

REQUIREMENT 10 / 100 · Rishi / engagement owner

Options after consultation

Provide a clear next step without implying that execution is compulsory.

Required actions

  1. Present independent implementation as a valid route.
  2. Describe a research study, launch plan or execution scope only when relevant.
  3. Define the output, approval gate and commercial terms before further work begins.
Review standard
The founder has a documented next step and can assess its scope and cost.

Working record

  • Recommended route
  • Deliverable and approval gate
  • Commercial proposal reference

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A short demand study may precede any inventory commitment or execution retainer.

Booking and terms

Record availability, payment, terms and communications.

REQUIREMENT 11 / 100 · Booking owner

Advisor introduction

Publish a factual description of Rishi’s role and involvement.

Required actions

  1. Record relevant experience, the work personally handled and the limits of involvement.
  2. Attach evidence or permitted references for specific experience claims.
  3. Approve the final public biography before publishing it.
Review standard
Every specific experience claim is supported and the founder knows who attends.

Working record

  • Role and involvement
  • Experience with supporting reference
  • Approved biography version

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Rishi’s name is confirmed. Years of experience, client names and performance claims remain to be supplied.

REQUIREMENT 12 / 100 · Booking owner

Business contact details

Give the founder a consistent way to contact the responsible person.

Required actions

  1. Use the supplied business WhatsApp number and identify the responsible owner.
  2. Add a business email only after it is provided and verified.
  3. Specify the purpose of each contact channel and an agreed response window.
Review standard
Published channels have been checked and responsibility is assigned.

Working record

  • Contact channel and address
  • Responsible person
  • Purpose and response window

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

WhatsApp: +91 70240 15382. No business email has been supplied yet.

REQUIREMENT 13 / 100 · Booking owner

Payable amount and invoice basis

Resolve the total amount before asking for payment.

Required actions

  1. Confirm whether the ₹2,000 quoted fee includes any applicable tax.
  2. Have the business or finance owner approve the invoice identity and tax treatment.
  3. Share the final payable total and payment reference before the founder proceeds.
Review standard
The final amount is explicit and matches the approved invoice or payment request.

Working record

  • Quoted fee and tax basis
  • Final payable total
  • Approved invoice details

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

The session fee is ₹2,000; tax inclusion has not been confirmed and must not be guessed.

Related requirements: 12, 21

REQUIREMENT 14 / 100 · Booking owner

Availability and meeting format

Avoid treating a preferred time as an accepted appointment.

Required actions

  1. Ask for preferred dates and display the timezone as Asia/Kolkata.
  2. Record the confirmed date, start time, 60-minute duration and meeting format.
  3. Send the agreed meeting location or link; keep a calendar entry only after confirmation.
Review standard
Both parties have agreed the slot and have the same joining details.

Working record

  • Preferred dates
  • Confirmed start and timezone
  • Meeting format and link

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

The calendar download in this workspace creates a manual reminder; it does not reserve availability.

REQUIREMENT 15 / 100 · Booking owner

Booking status

Track the difference between a request and a confirmed session.

Required actions

  1. Use requested, slot proposed, awaiting payment, confirmed, completed or cancelled.
  2. Record who changed the state and the supporting communication reference.
  3. Confirm only when the agreed booking conditions are met.
Review standard
The state is supported by a dated record and no request is described as confirmed prematurely.

Working record

  • Booking reference
  • Status and date
  • Evidence of confirmation

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A WhatsApp enquiry remains “Requested” until the slot and booking details are agreed.

Related requirements: 13, 14, 18, 19

REQUIREMENT 16 / 100 · Booking owner

Payment acknowledgement

Keep payment records accurate and separate from payment processing.

Required actions

  1. Record amount received, date and a limited transaction reference.
  2. Match the receipt to the booking and approved invoice identity.
  3. Share an acknowledgement only after checking the payment with the actual provider or bank.
Review standard
The recorded receipt reconciles with the real payment record.

Working record

  • Amount and date received
  • Payment / receipt reference
  • Booking match and reviewer

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A manually entered payment reference is a record, not proof that this website collected money.

REQUIREMENT 17 / 100 · Booking owner

Session reminders

Make reminder responsibility and consent explicit.

Required actions

  1. Record the channel, joining details and a suitable reminder time.
  2. Assign manual reminders or configure the chosen booking provider.
  3. Check delivery or failure in the actual system and avoid sending duplicate reminders.
Review standard
The reminder has an owner and the joining link has been checked.

Working record

  • Reminder time and channel
  • Assigned sender / provider
  • Sent or failed evidence

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

An optional calendar file contains a local alert; WhatsApp reminders are not automated here.

REQUIREMENT 18 / 100 · Booking owner

Rescheduling terms

Agree a process that is clear before the customer pays.

Required actions

  1. Decide the required notice, permitted changes and how a new slot is selected.
  2. Define what happens when the advisor needs to move the session.
  3. Approve and share the policy version before payment; do not invent a default notice period.
Review standard
The business has approved the policy and the customer received it before booking.

Working record

  • Proposed notice and limits
  • Advisor reschedule process
  • Approved version and customer acknowledgement

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

“Notice period to be agreed” is an internal drafting field, not an accepted customer term.

REQUIREMENT 19 / 100 · Booking owner

Cancellation, no-show and refunds

Prevent ambiguity about a missed or cancelled session.

Required actions

  1. Specify cancellation eligibility, no-show treatment and any exceptions.
  2. Define how a refund is requested, reviewed and processed through the payment route.
  3. Obtain qualified review where needed and retain the policy version accepted by the customer.
Review standard
The final rules are clear, reviewed and communicated before payment.

Working record

  • Cancellation and no-show proposal
  • Refund process and timing
  • Approved policy / acknowledgement

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

No non-refundable policy or refund deadline has been assumed for this service.

REQUIREMENT 20 / 100 · Booking owner

Post-call communication

Set a reasonable boundary for follow-up.

Required actions

  1. Agree whether clarifications are included, the channel and the time window.
  2. Identify the owner who responds and what requires a separate engagement.
  3. Record any promised note or document and its due date.
Review standard
The follow-up commitment is specific and has an accountable owner.

Working record

  • Included follow-up
  • Channel and response commitment
  • Excluded work and escalation

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A clarification on a discussed action can be distinguished from building a new financial model.

Business and commercial terms

Make capability, evidence, fees and ownership reviewable.

REQUIREMENT 21 / 100 · Business owner

Business identity

Use consistent details across the site, proposal and invoice.

Required actions

  1. Record the trading name, legal entity where applicable and authorised signatory.
  2. Have the business owner verify invoice and contact details.
  3. Compare the approved details across all customer-facing documents.
Review standard
The website, proposal and invoice can be reconciled to the same business.

Working record

  • Trading / legal identity
  • Invoice and signatory details
  • Approved document references

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Brandlyhumann is the brand name; legal entity and invoicing details remain to be confirmed.

REQUIREMENT 22 / 100 · Business owner

Verified case studies

Show evidence of actual work with enough context to interpret it.

Required actions

  1. Record starting conditions, scope, period, spend and the definition of the outcome.
  2. Separate contribution from factors outside the engagement and include material limitations.
  3. Obtain permission for identifiable clients, documents and results.
Review standard
The case is supported, permissioned and clearly distinguishes facts from inference.

Working record

  • Starting position and scope
  • Period, spend and measured result
  • Evidence, limitations and publication permission

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Routine No.01 is an illustrative project and cannot be relabelled as a real client result.

Related requirements: 23

REQUIREMENT 23 / 100 · Business owner

Work samples

Let a founder inspect the quality of the deliverables.

Required actions

  1. Select a product brief, quote comparison, cost model and weekly report.
  2. Remove confidential information and retain the scope and version context.
  3. Label fictional examples as examples and obtain permission for real client material.
Review standard
The sample can be reviewed without misrepresenting its origin or exposing confidential data.

Working record

  • Sample and version
  • Context / what it demonstrates
  • Permission and redaction review

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A blank purchase-order checklist demonstrates structure, not a verified supplier relationship.

REQUIREMENT 24 / 100 · Business owner

Team and responsibilities

Show who is accountable for each part of the work.

Required actions

  1. Name confirmed team members and their actual roles.
  2. Distinguish employees, independent specialists and unappointed roles.
  3. Record involvement, capacity, decision rights and the escalation owner.
Review standard
Each promised function has a real accountable person or an explicit staffing gap.

Working record

  • Name and confirmed relationship
  • Responsibility and availability
  • Evidence and escalation owner

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

“Regulatory reviewer to appoint” remains a gap until a qualified person accepts the scope.

REQUIREMENT 25 / 100 · Business owner

Capability boundaries

Clarify what the business delivers directly and what needs another party.

Required actions

  1. Map each deliverable to in-house work, a confirmed partner or a specialist to appoint.
  2. Verify access and capacity before making a delivery commitment.
  3. Identify the founder’s obligations and dependencies that affect the schedule.
Review standard
The proposal reflects confirmed capability and names unresolved dependencies.

Working record

  • Capability and delivery route
  • Confirmed provider and capacity
  • Dependencies and exclusions

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A supplier introduction does not automatically include factory verification or product release approval.

REQUIREMENT 26 / 100 · Business owner

Deliverables catalogue

Make the promised work inspectable and measurable.

Required actions

  1. Specify the output, format, level of detail and included revisions.
  2. Name the source inputs, delivery date and acceptance criteria.
  3. Identify ongoing services separately from one-time documents.
Review standard
A reviewer can decide whether the agreed output has been delivered.

Working record

  • Deliverable and format
  • Inputs, revisions and due date
  • Acceptance standard

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A supplier comparison includes like-for-like landed costs, MOQ, lead time, terms and unresolved checks.

REQUIREMENT 27 / 100 · Business owner

Execution fees and stages

Show the commercial commitment before work begins.

Required actions

  1. List fixed fees, recurring fees and any variable fee basis separately.
  2. Tie billing stages to agreed dates or accepted deliverables.
  3. Record taxes, payment terms, revision limits and the treatment of scope changes.
Review standard
The total commitment and each billing trigger are unambiguous.

Working record

  • Fee basis and amount
  • Billing trigger and due date
  • Proposal version and inclusions

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

The ₹2,000 consultation fee is confirmed; execution pricing has not been supplied.

Related requirements: 26, 28, 29, 30

REQUIREMENT 28 / 100 · Business owner

External expenditure

Prevent service fees from hiding the cost of running the brand.

Required actions

  1. List product, packaging, tests, inventory, media, software, logistics and specialist costs.
  2. State who contracts, pays and approves each supplier.
  3. Separate quotes, estimates and contingencies; include payment dates in cash planning.
Review standard
External costs are visible and funded separately from professional fees.

Working record

  • Expense and estimate / quote
  • Contracting and paying party
  • Approval limit and payment date

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Inventory deposits and advertising spend remain in the brand cash plan even if coordinated by a studio.

REQUIREMENT 29 / 100 · Business owner

Commissions and markups

Make commercial incentives visible before a recommendation is accepted.

Required actions

  1. Record referral fees, commissions, procurement markups or other benefits where they exist.
  2. State the payer, basis and potential effect on the recommendation.
  3. Disclose the arrangement before commitment and retain acknowledgement.
Review standard
The founder can assess the recommendation with its commercial incentives disclosed.

Working record

  • Arrangement or explicit none
  • Payer and calculation basis
  • Disclosure and acknowledgement

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Do not state “no commissions” unless the business owner has verified that position.

REQUIREMENT 30 / 100 · Business owner

Ownership and access

Protect the brand’s ability to operate independently.

Required actions

  1. Record ownership of the domain, artwork, formula or design rights, tooling, store and data.
  2. Define licences, transfer conditions and third-party restrictions in the agreement.
  3. Use named account access and founder-controlled recovery; store no passwords in this atlas.
Review standard
Ownership and access are agreed before material work or spend.

Working record

  • Asset and ownership / licence
  • Access and recovery owner
  • Transfer conditions and agreement

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Creator footage may be licensed for a limited period even when the brand owns its website.

Founder and category fit

Match available cash, operating capacity and the launch scope.

REQUIREMENT 31 / 100 · Founder

Starting-stage assessment

Begin with the current evidence and constraints.

Required actions

  1. Record whether the business is exploring, validating, preparing launch or already selling.
  2. Identify completed work, existing obligations and unresolved decisions.
  3. Prioritise the next approval gate instead of restarting every workstream.
Review standard
The plan starts from a dated, evidence-based assessment.

Working record

  • Current stage
  • Completed work and obligations
  • Next decision and missing evidence

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

An existing retailer may have supply access but still need D2C unit costs and fulfilment tests.

REQUIREMENT 32 / 100 · Founder

Available capital

Distinguish willingness to invest from usable cash.

Required actions

  1. Record cash available now, later committed funding and uncertain funding separately.
  2. Deduct existing business commitments and protect the agreed reserve.
  3. Link dated funding availability to supplier and launch payments.
Review standard
The launch plan can be funded without relying on unconfirmed money.

Working record

  • Available now
  • Later funding amount, date and certainty
  • Existing commitments and protected reserve

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A ₹50 lakh intention with ₹20 lakh available now cannot fund an immediate ₹35 lakh commitment.

REQUIREMENT 33 / 100 · Founder

Founder operating involvement

Match the work plan to time the founder can actually provide.

Required actions

  1. Record weekly availability and which approvals require the founder.
  2. Allocate preparation, supplier review, content and commercial decisions.
  3. Identify coverage for absences and delays in decision-making.
Review standard
The plan names the founder’s commitments and the effect of missed approvals.

Working record

  • Weekly time available
  • Responsibilities retained
  • Backup and approval turnaround

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A two-hour weekly review cannot also cover daily customer support without another owner.

REQUIREMENT 34 / 100 · Founder

Decision authority

Prevent conflicting instructions and stalled approvals.

Required actions

  1. Name the budget approver, product approver and final commercial signatory.
  2. Set spending limits and escalation rules.
  3. Record how disagreements and unavailable approvers are handled.
Review standard
Each material decision has one accountable approver and an escalation route.

Working record

  • Decision type and authority
  • Limit / delegated authority
  • Escalation and substitute

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

The marketing owner may test within an approved cap but cannot change the supplier PO.

REQUIREMENT 35 / 100 · Founder

Existing resources and constraints

Use assets that genuinely reduce launch difficulty.

Required actions

  1. Inventory the audience, distribution, expertise, suppliers and team already available.
  2. Attach evidence of access, capacity and commercial terms.
  3. Record restrictions such as geography, working hours, storage or seasonal demand.
Review standard
The plan uses verified resources rather than assumed access.

Working record

  • Resource and evidence
  • Usable capacity / terms
  • Constraint and effect on scope

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

An audience’s follower count is separate from evidence that its members buy this category.

REQUIREMENT 36 / 100 · Founder

Category shortlist

Compare two or three narrow opportunities on the same basis.

Required actions

  1. Score buyer evidence, founder fit, supply access, contribution and operating complexity.
  2. Record the evidence behind each score and what remains unknown.
  3. Review trade-offs before selecting one launch scope; do not use a growth ranking alone.
Review standard
The selection has a traceable rationale and unresolved risks are visible.

Working record

  • Category and launch scope
  • Evidence by decision criterion
  • Trade-offs and recommendation

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Skincare and home cleaning may both repeat, but release requirements, packaging and shipment costs differ.

Related requirements: 31, 32, 35, 41

REQUIREMENT 37 / 100 · Founder

Capital-to-scope fit

Reduce the range when the funded plan is too large.

Required actions

  1. Build the full cost of the proposed SKU count, channel mix and launch geography.
  2. Include samples, minimum orders, overhead, reorder cash and a reserve.
  3. Remove optional variants or channels before compromising required product checks.
Review standard
The chosen scope fits available cash through launch and the first reorder.

Working record

  • Proposed scope and total cost
  • Funded amount and reserve
  • Scope removed or deferred

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

One product in two pack sizes may still create two packaging MOQs and separate stock exposure.

REQUIREMENT 38 / 100 · Founder

Business and supply route

Choose the operating model deliberately.

Required actions

  1. Compare own manufacturing, contract manufacture, private label and distribution where relevant.
  2. Document control over specification, lead time, IP, margin and working capital.
  3. Obtain qualified advice on the obligations created by the actual product and route.
Review standard
The founder accepts the route’s cost, control and responsibility trade-offs.

Working record

  • Routes considered
  • Commercial and operational comparison
  • Chosen route and unresolved obligations

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Private label can shorten development but does not remove the need to review product and claim suitability.

REQUIREMENT 39 / 100 · Founder

Launch geography

Define where the business can reliably sell and serve.

Required actions

  1. Select cities or pincodes, languages and shipping conditions.
  2. Check serviceability, charges, return handling and any product-specific transport limits.
  3. Align targeting, product pages and support promises to that scope.
Review standard
Acquisition only targets locations the operation can serve as promised.

Working record

  • Geography and language
  • Serviceability and restrictions
  • Delivery and support promise

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A fragile home product can start in fewer lanes until transit damage and reverse logistics are understood.

REQUIREMENT 40 / 100 · Founder

Investment stop conditions

Agree when the founder will pause further commitment.

Required actions

  1. Set evidence, cash, quality and delay conditions before major spending.
  2. Define the decision owner and what commitments can still be cancelled or deferred.
  3. Review the conditions at each release or reorder gate.
Review standard
The team knows when to pause and what evidence is needed to restart.

Working record

  • Trigger and threshold
  • Exposure / commitments affected
  • Owner and corrective decision

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Pause a reorder if unresolved product complaints or forecast cash fall beyond the agreed limits.

Related requirements: 32, 37

Customer evidence

Test purchase behaviour, the offer and the reason to switch.

REQUIREMENT 41 / 100 · Research owner

Buyer profile

Describe a buying situation that can be researched and served.

Required actions

  1. Record the occasion, current product, purchase channel and actual spend.
  2. Identify suitability needs and what causes dissatisfaction.
  3. Use observed behaviour to define the first segment rather than broad demographics alone.
Review standard
The profile explains a specific purchase decision and is linked to real observations.

Working record

  • Buying occasion and current alternative
  • Actual spend and channel
  • Problem and evidence

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

“People replacing an uncomfortable daily moisturiser” is more testable than “everyone aged 18–40.”

REQUIREMENT 42 / 100 · Research owner

Purchase-evidence interviews

Learn from actual behaviour before asking for opinions on an idea.

Required actions

  1. Ask about the last purchase, alternatives considered, price and what happened after use.
  2. Record the respondent code, date, source and important contrary evidence.
  3. Separate reported facts from interpretation and avoid treating interview count as market demand.
Review standard
Notes can be traced to observations and show both supporting and conflicting evidence.

Working record

  • Respondent code and date
  • Last purchase and use experience
  • Evidence, interpretation and contrary finding

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A stated intention to buy becomes a hypothesis until an offer is tested at a real price.

REQUIREMENT 43 / 100 · Research owner

Competitor comparison

Compare the products a customer would actually consider.

Required actions

  1. Capture the variant, pack quantity, displayed price, channel, date and source.
  2. Separate MRP, paid price, conditional offers and delivery charges.
  3. Compare claims as brand statements and avoid unsupported unit conversions.
Review standard
Each comparison uses a dated, like-for-like basis or explains why it cannot.

Working record

  • Product / variant and source
  • Price, quantity, channel and date
  • Comparison and limitation

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A 50 g pack and a 50 ml pack cannot be assumed equivalent without a valid conversion.

REQUIREMENT 44 / 100 · Research owner

Review analysis

Find recurring concerns without inventing prevalence.

Required actions

  1. Define the platforms, date range and review sample used.
  2. Code themes such as quality, fit, packaging, delivery and value; retain source references.
  3. Report the denominator, sampling bias and conflicting evidence before suggesting a product change.
Review standard
A reader can see how the sample was selected and what the findings cannot establish.

Working record

  • Sample and sources
  • Themes with counts / denominator
  • Limitations and product implication

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Eight leakage mentions among 60 selected reviews are a sample observation, not a category defect rate.

REQUIREMENT 45 / 100 · Research owner

Reason to switch

Make the proposed advantage relevant and supportable.

Required actions

  1. Name the current alternative and the specific improvement the buyer values.
  2. Connect the proposed benefit to evidence from the actual product.
  3. Check whether the advantage survives the real price, delivery charge and inconvenience of switching.
Review standard
The reason to switch is supported by buyer and product evidence.

Working record

  • Current alternative
  • Proposed improvement and proof
  • Price / switching objection

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A better dispensing pack may matter only if users experience the current pack as wasteful.

REQUIREMENT 46 / 100 · Research owner

Initial market segment

Keep the first launch narrow enough to learn from.

Required actions

  1. Select one use case, buyer group and geographic scope.
  2. Define who the initial offer is not designed for.
  3. Choose channels and support language appropriate to that segment.
Review standard
The first offer has a coherent buyer, message and delivery route.

Working record

  • Initial segment and use case
  • Excluded uses / buyers
  • Channel and geography

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A workday lunch container for commuters is a narrower starting scope than all kitchen storage.

REQUIREMENT 47 / 100 · Research owner

Price validation

Test willingness to pay at the intended commercial offer.

Required actions

  1. Show the real pack, quantity, delivery conditions and price.
  2. Record accepted purchases, refusals and the reason given.
  3. Compare results across a defined sample and retain the effect of discounts separately.
Review standard
The evidence uses an actual offer and distinguishes paid response from stated interest.

Working record

  • Offer and total payable price
  • Sample / purchases / refusals
  • Objections and pricing decision

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A discounted trial does not establish full-price demand unless the discount effect is examined.

REQUIREMENT 48 / 100 · Research owner

Controlled paid pilot

Learn from an offer the business can deliver responsibly.

Required actions

  1. Approve the product, quantity, customer terms, fulfilment and support process before accepting payment.
  2. Cap the pilot by stock, cash and service capacity.
  3. Record delivery, refunds, issues and customer feedback; arrange clear remedies for unmet promises.
Review standard
The pilot is deliverable and the decision uses retained orders after relevant outcomes.

Working record

  • Pilot offer and deliverable stock
  • Customer terms and spend cap
  • Retained results, issues and remedies

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A 40-order pilot tests the actual pack and dispatch process before a broader campaign.

Related requirements: 47, 49, 56, 57, 76

REQUIREMENT 49 / 100 · Research owner

Predefined test criteria

Prevent a weak result from being reinterpreted after the event.

Required actions

  1. State the question, sample, duration and maximum spend.
  2. Define success, stop conditions and what would make the result inconclusive.
  3. Assign an owner and review date before starting.
Review standard
The test record predates spend and includes a decision rule.

Working record

  • Question, sample and duration
  • Budget, pass and stop conditions
  • Owner and review date

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A price test with too few eligible visitors may be inconclusive even when two purchases occur.

REQUIREMENT 50 / 100 · Research owner

Validation decision

Turn research into an explicit investment decision.

Required actions

  1. Summarise supporting and opposing evidence against the pre-agreed test.
  2. Choose proceed, modify, retest or stop and record the reason.
  3. Define the next commitment, owner and evidence gate.
Review standard
The decision can be reviewed without reconstructing the entire research process.

Working record

  • Evidence summary
  • Decision and rationale
  • Next commitment and gate

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Proceed to supplier samples while deferring a full inventory order until product checks are complete.

Related requirements: 42, 47, 48, 49

Product and suppliers

Control specifications, samples, purchase orders and release.

REQUIREMENT 51 / 100 · Product / sourcing owner

Hero product brief

Give everyone the same definition of the initial product.

Required actions

  1. Describe the buyer, occasion, problem, product format and intended price.
  2. Record the expected performance, pack quantity, variants and exclusions.
  3. Link the brief to the current evidence and approved specification version.
Review standard
The brief is specific enough to obtain comparable quotations and samples.

Working record

  • Buyer / problem / intended benefit
  • Format, quantity, variants and price
  • Evidence and brief version

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A daily cleanser brief names the intended user experience and pack, without unsupported treatment claims.

REQUIREMENT 52 / 100 · Product / sourcing owner

Assortment and variant limit

Expose the cash and operational cost of adding another option.

Required actions

  1. List the role of every SKU and variant.
  2. Calculate incremental MOQ, packaging, testing, creative, stock and support complexity.
  3. Approve additions only when the expected benefit justifies the funded cost.
Review standard
Every launch SKU has a reason to exist and a funded stock plan.

Working record

  • SKU / variant and role
  • Incremental cost and MOQ
  • Evidence and approval decision

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A new fragrance can require separate packaging and stock even when the base formula is shared.

REQUIREMENT 53 / 100 · Product / sourcing owner

Product specification

Make product quality measurable for the actual category.

Required actions

  1. Document ingredients or materials, dimensions or fill quantity, tolerances and performance requirements as relevant.
  2. Specify packaging, storage, transport and traceability needs.
  3. Have the appropriate technical reviewer approve the version used for samples and production.
Review standard
Supplier, sample and purchase order all refer to the same approved specification.

Working record

  • Technical specification and tolerances
  • Packaging / storage / traceability
  • Approved version and technical reviewer

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

For apparel, size tolerances and wash behaviour replace skincare-specific formulation fields.

REQUIREMENT 54 / 100 · Product / sourcing owner

Comparable quotation request

Obtain offers that can be compared on the same scope.

Required actions

  1. Send the same product specification, quantity and packaging requirements to each supplier.
  2. Request itemised unit costs, tooling, tests, freight, taxes, MOQ, validity and lead time.
  3. Record exclusions, payment dates and the remedy for defects or substitutions.
Review standard
Material differences between quotations are visible before selection.

Working record

  • Specification and quantity issued
  • Itemised quotation and validity
  • Exclusions, payment and remedy terms

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A cheaper ex-factory price may become more expensive after packaging, freight and tooling.

Related requirements: 51, 53

REQUIREMENT 55 / 100 · Product / sourcing owner

Component-level minimum orders

Find the smallest practical production commitment.

Required actions

  1. Record MOQ for finished product, bottle, closure, label, carton, colour and other relevant components.
  2. Identify excess or unused components and their ownership and storage cost.
  3. Align purchasing with usable product yield and future reorders.
Review standard
The purchase plan funds every component and identifies stranded stock exposure.

Working record

  • Component and MOQ
  • Required, excess and usable quantity
  • Cash cost, storage and ownership

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A 1,000-unit fill can still require 3,000 printed cartons; the extra cartons consume cash.

REQUIREMENT 56 / 100 · Product / sourcing owner

Sample evaluation

Approve a reference sample through recorded criteria.

Required actions

  1. Define checks against the specification, use experience and packaging requirements.
  2. Record sample version, test conditions, defects and required revisions.
  3. Retain an approved reference and reviewer sign-off before production release.
Review standard
The approval refers to a specific sample and unresolved issues are closed or explicitly rejected.

Working record

  • Sample ID and version
  • Checks, results and defects
  • Approved reference and reviewer

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A visual sample approval does not replace the applicable technical or safety assessment.

Related requirements: 53, 54

REQUIREMENT 57 / 100 · Product / sourcing owner

Product-specific release review

Identify the qualified checks required for the actual product.

Required actions

  1. Ask the responsible specialist to determine classification, applicable licences, tests, labels and release records.
  2. Record the current source, scope, reviewer and evidence for each requirement.
  3. Keep sale and claims on hold where required approvals or evidence are missing.
Review standard
A qualified reviewer has assessed the actual SKU and approved the required release evidence.

Working record

  • Product route and applicable requirement
  • Reviewer, source and test / licence evidence
  • Release decision and unresolved condition

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

The same broad category can contain products with different obligations; this checklist is not an approval.

Related requirements: 53, 56, 58

REQUIREMENT 58 / 100 · Product / sourcing owner

Claims evidence register

Control what appears on packaging, pages and advertising.

Required actions

  1. Record the exact proposed claim and every place it will appear.
  2. Link evidence to the actual product, method, population and conditions assessed.
  3. Have the appropriate reviewer approve wording, limitations and review dates.
Review standard
Each published claim matches its evidence and approved scope.

Working record

  • Exact claim and placement
  • Evidence scope and limitations
  • Approved wording, reviewer and date

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A supplier ingredient study does not automatically substantiate the finished product’s performance.

REQUIREMENT 59 / 100 · Product / sourcing owner

Purchase-order terms

Make the production commitment specific and enforceable through the agreed contract.

Required actions

  1. Reference specification, approved sample, quantities, price and delivery schedule.
  2. Record deposits, balance triggers, inspection, defects and substitution controls.
  3. Agree ownership, cancellation and dispute terms with appropriate commercial or legal review.
Review standard
The authorised PO and agreement resolve material commercial and quality terms.

Working record

  • PO, specification, quantity and dates
  • Payment / inspection / defect terms
  • Ownership, substitution and contract review

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A message saying “same as sample” is insufficient if the sample version and acceptance criteria are unclear.

Related requirements: 54, 55, 56, 57

REQUIREMENT 60 / 100 · Product / sourcing owner

Supply contingency

Plan for a supplier or component failure before launch.

Required actions

  1. Identify single-source components and realistic replacement lead times.
  2. Check backup compatibility, qualification requirements and minimum orders.
  3. Define reserve stock, recovery cost, customer communication and decision ownership.
Review standard
The fallback can be assessed for quality, timing and cash impact.

Working record

  • Failure scenario and exposure
  • Qualified backup / validation needed
  • Recovery time, cost and owner

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

An alternative pump must be checked with the actual bottle and product before it is substituted.

Related requirements: 54, 55

Economics and cash

Connect retained sales, contribution, working capital and risk.

REQUIREMENT 61 / 100 · Finance owner

Landed product cost

Build the cost from usable units rather than the quoted factory price.

Required actions

  1. Include product, primary and secondary pack, inbound freight, handling and applicable non-recoverable charges.
  2. Allocate tooling and tests on an explicit basis; separate recoverable tax and one-time spending.
  3. Use expected usable yield and record source quotations and dates.
Review standard
The per-unit cost reconciles to the purchase scope without omitted or double-counted components.

Working record

  • Cost components and sources
  • Tax / allocation basis
  • Usable units and landed cost

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A ₹200 factory unit may cost more after its bottle, carton, inbound freight and rejected units.

Related requirements: 54, 55

REQUIREMENT 62 / 100 · Finance owner

Gross-to-net revenue

Use retained revenue rather than gross orders to judge performance.

Required actions

  1. Reconcile gross merchandise value, discounts, cancellations and refunds using mutually exclusive amounts.
  2. Remove applicable tax from retained collections using the correct rate or invoice-level treatment.
  3. Exclude shipping revenue from merchandise values or model it separately and reconcile to orders.
Review standard
The bridge reconciles to the source records and no refund is deducted twice.

Working record

  • Period and order scope
  • Gross, discount, cancellation and refund bridge
  • Tax basis and retained revenue reconciliation

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

The additional calculator uses one stated tax rate; mixed-rate baskets need line-level calculations.

REQUIREMENT 63 / 100 · Finance owner

SKU and bundle composition

Know exactly what each sold offer consumes.

Required actions

  1. Link each offer to its component SKUs and quantities.
  2. Include inserts, gifts and outbound packing where relevant without duplicating costs.
  3. Check that prices and discounts support the full bundle cost and stock availability.
Review standard
The offer cost is reproducible from the bill of materials.

Working record

  • Offer and component quantities
  • Component costs and extra materials
  • Net offer revenue and stock dependency

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A two-item routine bundle consumes one cleanser and one moisturiser even if shown as one order.

REQUIREMENT 64 / 100 · Finance owner

Contribution and operating balance

Separate product margin, acquisition contribution and recurring costs.

Required actions

  1. Calculate net retained revenue less product, packing, fulfilment, losses and channel charges.
  2. Deduct acquisition and other variable selling costs on the stated customer basis.
  3. Deduct recurring costs separately and reconcile one-offs, finance and tax outside that balance.
Review standard
The reported balance states its basis and is not confused with cash flow.

Working record

  • Revenue and variable cost basis
  • Acquisition and contribution
  • Recurring costs and excluded items

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Positive product margin can coexist with negative contribution after customer acquisition.

Related requirements: 61, 62, 63

REQUIREMENT 65 / 100 · Finance owner

Channel profitability

Assess each route using its own cost and settlement terms.

Required actions

  1. Capture commissions, payment, fulfilment, promotions, return charges and deductions.
  2. Allocate costs consistently and avoid counting brand and platform-funded offers twice.
  3. Reconcile settlements to orders and add settlement delays to the cash forecast.
Review standard
The channel can be compared on net contribution and cash exposure.

Working record

  • Channel fee and deduction schedule
  • Retained orders and contribution
  • Settlement timing and reconciliation

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Marketplace GMV and website net sales need a common retained-sales definition before comparison.

REQUIREMENT 66 / 100 · Finance owner

Allowable acquisition cost

Set an acquisition ceiling supported by contribution.

Required actions

  1. Start with pre-acquisition contribution on a retained first order.
  2. Deduct the contribution required for overhead and the chosen risk buffer.
  3. Extend payback only with observed mature repeat contribution and a funded cash horizon.
Review standard
The spend ceiling can be defended without speculative lifetime value.

Working record

  • First-order contribution
  • Required reserve and CAC ceiling
  • Payback evidence and cash limit

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

With ₹600 pre-acquisition contribution and ₹200 reserve, an illustrative CAC ceiling is ₹400.

Related requirements: 64, 65

REQUIREMENT 67 / 100 · Finance owner

Break-even and capacity

Check whether break-even volume is operationally attainable.

Required actions

  1. Divide recurring cost by contribution after the planned acquisition mix.
  2. Round required retained orders up and compare with stock, fulfilment and support capacity.
  3. Show no finite break-even when contribution is zero or negative.
Review standard
The required volume fits the funded operating capacity or the plan is revised.

Working record

  • Recurring cost and contribution basis
  • Required retained orders
  • Capacity and constraint

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

₹2 lakh recurring cost at ₹250 contribution requires 800 retained orders before excluded items.

Related requirements: 64, 66

REQUIREMENT 68 / 100 · Finance owner

Dated launch budget

Translate a capital allocation into payment commitments.

Required actions

  1. Allocate research, product, inventory, store, creative, launch spend, people and reserve.
  2. Separate estimate, quote, commitment and paid amount.
  3. Assign due dates and approval limits, then feed the schedule into the cash forecast.
Review standard
The launch budget reconciles with cash timing and protects the agreed reserve.

Working record

  • Budget item and evidence level
  • Allocated, committed and paid
  • Due date and approval

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

An inventory deposit and final balance are separate dates even when one PO covers both.

REQUIREMENT 69 / 100 · Finance owner

13-week cash forecast

Expose the week cash becomes constrained.

Required actions

  1. Enter opening cash and actual expected collections rather than booked sales.
  2. Schedule supplier payments, media, people, refunds, tax and other cash outflows.
  3. Review closing cash and the minimum reserve every week; reconcile forecasts with actuals.
Review standard
Each week is funded or has an approved action before commitments fall due.

Working record

  • Opening cash and collection basis
  • Dated inflows and outflows
  • Reserve, low point and corrective action

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A profitable month can still have a cash shortfall before marketplace settlements arrive.

Related requirements: 32, 68

REQUIREMENT 70 / 100 · Finance owner

Downside cash cases

Test the impact of delay or weaker trading before scaling.

Required actions

  1. Model delayed collections, higher acquisition spend, excess stock and changed supplier payments.
  2. Keep recoverable timing shifts separate from permanent revenue loss or added cost.
  3. Compare the lowest cash balance with the reserve and record a specific response.
Review standard
The downside has a dated cash effect and a feasible funding or scope response.

Working record

  • Scenario and changed assumptions
  • Cash low point and reserve gap
  • Action, owner and trigger

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

The sensitivity tool shifts receipts by whole weeks and leaves receipts after week 13 outside the horizon.

Related requirements: 69

Brand and purchase experience

Give customers the information and service needed to buy.

REQUIREMENT 71 / 100 · Brand / commerce owner

Name, domain and mark review

Reduce identity conflicts before investing in packaging.

Required actions

  1. Shortlist names and check practical domain and social handle availability.
  2. Arrange an appropriate trademark or name review for intended markets and product classes.
  3. Record the reviewer, scope, date and decision before committing to production artwork.
Review standard
The chosen identity has the agreed review and unresolved conflicts are visible.

Working record

  • Names and practical availability
  • Qualified review and scope
  • Decision and commitment gate

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

An available domain does not establish trademark clearance.

REQUIREMENT 72 / 100 · Brand / commerce owner

Brand standards

Give every producer a usable visual and verbal reference.

Required actions

  1. Define fonts, colour values, spacing, logo use, photography and packaging rules.
  2. Set the tone, product terminology and claim boundaries.
  3. Store approved source files and examples with a version owner.
Review standard
Design and content can be produced consistently from the approved reference.

Working record

  • Visual rules and source files
  • Tone, terminology and claims
  • Approved version and owner

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

The atlas uses ivory, charcoal and muted bronze; the founder’s product brand needs its own approved standards.

REQUIREMENT 73 / 100 · Brand / commerce owner

Complete product page

Answer the questions that affect suitability and purchase.

Required actions

  1. Specify contents, quantity, materials or ingredients, use and important limitations.
  2. Show accurate images, price, availability, delivery and returns information.
  3. Check mobile presentation and route technical claims through the approved evidence register.
Review standard
A customer can understand the actual offer and relevant limitations before paying.

Working record

  • Required product information
  • Images, use and limitations
  • Commercial information and QA result

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A bundle page lists every included item and quantity rather than showing only a lifestyle photograph.

Related requirements: 51, 57, 58, 75, 76

REQUIREMENT 74 / 100 · Brand / commerce owner

Actual product demonstration

Make evidence visible in the buying journey.

Required actions

  1. Film or photograph the actual approved product and pack.
  2. Show the relevant use, scale, texture, fit, assembly or performance without misleading edits.
  3. Record consent, rights and conditions; use only supportable outcomes.
Review standard
The demonstration accurately represents the product being sold.

Working record

  • Demonstration and product version
  • Conditions and claim evidence
  • Rights and approved placements

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A bag demonstration can show dimensions and compartments; an untested load claim should not be added.

REQUIREMENT 75 / 100 · Brand / commerce owner

Delivery information

Set a promise the fulfilment operation can meet.

Required actions

  1. Confirm pincode serviceability, charges, dispatch cut-offs and delivery estimates.
  2. Identify product or location restrictions and peak-period exceptions.
  3. Keep product pages, checkout and support messages consistent.
Review standard
Customers see the relevant cost and timing before paying.

Working record

  • Pincode / route and charges
  • Dispatch and delivery basis
  • Restrictions and consistency check

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A dispatch estimate is distinct from the carrier’s expected transit time.

REQUIREMENT 76 / 100 · Brand / commerce owner

Returns and refunds information

Make customer remedies understandable before purchase.

Required actions

  1. Define eligibility, time window, product conditions, exclusions and who pays relevant charges.
  2. Specify the request, inspection, approval and refund process.
  3. Have the policy reviewed for the actual product and selling route, then test its customer-facing presentation.
Review standard
The policy is reviewed, accessible and consistent with the actual operating process.

Working record

  • Eligibility and conditions
  • Request, approval and refund process
  • Reviewed policy and display locations

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Personal care, apparel and fragile home products may need different handling; no universal policy is assumed.

REQUIREMENT 77 / 100 · Brand / commerce owner

Checkout and payment tests

Find transaction failures before traffic is scaled.

Required actions

  1. Test success, failure, retry, duplicate submission and cancellation using the provider’s supported test process.
  2. Check order creation, inventory, customer messages and payment reconciliation.
  3. Test refund and recovery paths, record device and method, and close critical defects.
Review standard
Critical purchase and refund paths pass on the intended devices and payment routes.

Working record

  • Test case, device and payment method
  • Expected and actual outcome
  • Defect, owner and retest evidence

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A payment success screen is insufficient if the order was not created or stock was not deducted.

Related requirements: 73, 75, 76

REQUIREMENT 78 / 100 · Brand / commerce owner

Communication permissions

Use contact data for the purpose the customer agreed to.

Required actions

  1. Separate transactional service messages from optional promotional communication.
  2. Record permission source, purpose, timestamp and withdrawal route where required.
  3. Review data access, retention and provider requirements with the responsible specialist.
Review standard
The message purpose and permission record align with the approved process.

Working record

  • Purpose and permission basis
  • Capture / withdrawal process
  • Access, retention and reviewer

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

An order-status message and a new-offer campaign need separately considered rules and customer controls.

REQUIREMENT 79 / 100 · Brand / commerce owner

Measurement definitions

Make marketing and finance reports reconcile.

Required actions

  1. Define product view, checkout, paid order, delivered order, cancellation and retained order.
  2. Implement deduplication, test events and consistent attribution windows.
  3. Reconcile analytics to commerce and payment records; document consent and tracking limitations.
Review standard
Teams use the same order basis and unexplained reporting differences are investigated.

Working record

  • Event and business definition
  • Implementation / deduplication check
  • Reconciliation and known limitation

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A platform-reported purchase is not automatically a retained first-time customer.

REQUIREMENT 80 / 100 · Brand / commerce owner

Mobile and accessibility review

Make the buying flow usable on the devices customers use.

Required actions

  1. Check readable text, contrast, tap targets, labels, keyboard focus and meaningful errors.
  2. Test slow loading, small screens and the complete purchase route.
  3. Record defects by impact and verify fixes before launch.
Review standard
The main purchase tasks work without blocking layout or interaction defects.

Working record

  • Device / viewport and task
  • Accessibility and performance findings
  • Fix owner and retest

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A mobile comparison table may scroll within its container while the page remains within the screen.

Sales and repeat purchases

Fund channel experiments and measure retained contribution.

REQUIREMENT 81 / 100 · Growth owner

First 100 customers

Build a funded route to early retained purchases.

Required actions

  1. Allocate target customers across specific sources and offers.
  2. Record audience access, conversion assumptions, budget and an owner.
  3. Track actual retained customers and spend; deduplicate people across routes.
Review standard
The routes total the chosen goal and their assumptions can be tested.

Working record

  • Route, audience and offer
  • Target, budget and owner
  • Actual retained customers and learning

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Founder network 25, focused paid pilot 50 and partner route 25 are a plan, not achieved sales.

Related requirements: 46, 47, 48, 64

REQUIREMENT 82 / 100 · Growth owner

Channel experiments

Give each channel a finite commercial test.

Required actions

  1. Define the audience, offer, destination, budget and measurement window.
  2. Set owner, stop rule and review date before spending.
  3. Assess retained customer cost, contribution and service effects before extending.
Review standard
The test has a clear question, a spend cap and a documented result.

Working record

  • Channel hypothesis and setup
  • Budget, owner and review date
  • Retained results and decision

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Search and discovery campaigns answer different questions and should not share an unexplained blended CAC.

Related requirements: 66, 73, 77, 79

REQUIREMENT 83 / 100 · Growth owner

Creative experiment register

Learn which message works and why.

Required actions

  1. Record audience, occasion, opening message, proof, offer and destination.
  2. Change a limited number of variables and retain the version that ran.
  3. Review spend, retained orders, contribution and customer misunderstandings.
Review standard
A creative decision can be tied to the actual asset and commercial outcome.

Working record

  • Creative version and hypothesis
  • Audience, proof and destination
  • Spend, retained result and learning

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A texture demonstration and a price-led message may attract different buyers and complaint patterns.

REQUIREMENT 84 / 100 · Growth owner

Creator agreements

Define content rights and commercial responsibilities before production.

Required actions

  1. Agree deliverables, revisions, fees, deadlines and approval process.
  2. Specify usage rights, territories, duration, paid-media permissions and disclosure requirements.
  3. Review product claims and retain the agreement and approved final asset.
Review standard
The planned publication and ad use are covered by the actual agreement.

Working record

  • Deliverables, fees and schedule
  • Usage rights and permissions
  • Disclosure, claims and approved asset

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Receiving a video does not automatically grant unlimited paid advertising rights.

Related requirements: 58, 74

REQUIREMENT 85 / 100 · Growth owner

Search and product feeds

Match high-intent queries with accurate product information.

Required actions

  1. Map category, problem, product and brand queries to suitable pages.
  2. Keep feed titles, identifiers, images, price, stock and destination consistent.
  3. Separate brand and non-brand performance and resolve feed errors before scaling.
Review standard
The feed and landing page agree and performance is interpreted by intent.

Working record

  • Intent and landing page
  • Feed fields and error checks
  • Brand / non-brand results

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A brand-name search may reflect demand created elsewhere rather than incremental discovery.

REQUIREMENT 86 / 100 · Growth owner

Marketplace readiness

Check the full trading route before listing inventory.

Required actions

  1. Prepare listing content, identifiers, category documentation and stock integration.
  2. Review fees, promotions, returns, penalties and settlement terms for the actual account.
  3. Rehearse order, return and settlement reconciliation with named owners.
Review standard
The listing can be fulfilled and its net contribution and cash cycle are understood.

Working record

  • Listing and document checklist
  • Fees, returns and settlement terms
  • Operational test and owner

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Platform fees vary by programme and terms; use the current account schedule rather than a generic rate.

REQUIREMENT 87 / 100 · Growth owner

Scale, hold or stop

Increase spending only when evidence and capacity support it.

Required actions

  1. Set thresholds for retained CAC, contribution, complaints, stock and cash.
  2. Review a sufficiently mature period and note sample size and attribution limits.
  3. Approve the next budget and stock commitment together, with a rollback condition.
Review standard
The decision is supported by commercial outcomes and the ability to fulfil.

Working record

  • Thresholds and review window
  • Evidence and capacity
  • Decision, budget and rollback trigger

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A winning acquisition test is held if the next production batch cannot arrive within the funded stock plan.

Related requirements: 69, 82, 83, 91, 93

REQUIREMENT 88 / 100 · Growth owner

Mature repeat cohorts

Measure repeat only when customers had time to reorder.

Required actions

  1. Group buyers by first delivered purchase and relevant product-use cycle.
  2. Define eligibility, observation window and unique repeat buyers.
  3. Report immature cohorts separately and distinguish repeat customers from repeat orders.
Review standard
The denominator includes only customers eligible for the stated repeat measure.

Working record

  • Cohort and eligibility rule
  • Eligible buyers and repeat buyers
  • Observation date and limitation

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A 45-day replenishment product cannot be assessed from customers who first received it last week.

Related requirements: 79

REQUIREMENT 89 / 100 · Growth owner

Lifecycle communication

Support product use before asking for another purchase.

Required actions

  1. Map order, delivery, usage guidance, service and replenishment messages.
  2. Use relevant timing, permissions and suppression for complaints, returns or recent orders.
  3. Assign the owner, content version and measure useful outcomes rather than sends alone.
Review standard
Messages fit the customer’s stage and respect the approved contact rules.

Working record

  • Trigger, segment and message
  • Permission and suppression rules
  • Owner and outcome

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

An unresolved quality complaint suppresses a routine repurchase promotion until the issue is addressed.

REQUIREMENT 90 / 100 · Growth owner

Repeat-purchase contribution

Check whether retention produces economic value.

Required actions

  1. Use net repeat revenue after discounts and refunds.
  2. Deduct product, fulfilment, payment, CRM, incentive and incremental service costs.
  3. Separate observed contribution from projected lifetime value and avoid double-counting campaign costs.
Review standard
The repeat result is based on actual costs and a defined observation period.

Working record

  • Observed repeat orders and revenue
  • Variable, CRM and service costs
  • Contribution and period / cohort

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A higher repeat rate can still reduce value if discounts and contact costs exceed contribution.

Related requirements: 64, 88, 89

Delivery and governance

Control stock, service, approvals, changes and handover.

REQUIREMENT 91 / 100 · Operations owner

Inventory and reorders

Plan from usable stock and funded demand.

Required actions

  1. Reconcile usable, quarantined, committed and confirmed inbound stock by SKU or component.
  2. Apply demand, lead time, review period, safety stock and MOQ with explicit assumptions.
  3. Check expiry where relevant, cash and supplier capacity before authorising the reorder.
Review standard
The reorder supports the plan without relying on unavailable or unusable stock.

Working record

  • Stock position and date
  • Demand, lead time and MOQ
  • Reorder quantity, cost and approval

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A bundle is constrained by its least-available component, even when finished-offer stock appears sufficient.

REQUIREMENT 92 / 100 · Operations owner

Fulfilment quality

Control what happens between an order and a successful delivery.

Required actions

  1. Check item, quantity, address, pack, batch or serial reference as relevant.
  2. Record picking, packing, handover, tracking and exception ownership.
  3. Sample order accuracy and transit outcomes, then correct the cause of defects.
Review standard
The order can be traced and material dispatch exceptions have an owner.

Working record

  • Order / batch and checks
  • Dispatch and tracking evidence
  • Exception and corrective action

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Leakage, wrong variants and missing bundle components need separate causes and corrective actions.

REQUIREMENT 93 / 100 · Operations owner

Customer support and escalation

Give customers a consistent route to resolution.

Required actions

  1. Define workflows for damage, quality, missing items, delays, refunds and suitability questions.
  2. Assign response and resolution owners and identify issues needing technical review.
  3. Keep relevant evidence, promised updates and closure confirmation without unnecessary personal data.
Review standard
The customer receives a clear next step and serious product issues reach the right reviewer.

Working record

  • Issue type and evidence
  • Owner, promised update and remedy
  • Escalation and closure

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A quality complaint may require batch investigation rather than only a replacement shipment.

REQUIREMENT 94 / 100 · Operations owner

Dependency-based launch calendar

Make dates depend on the work required to release and deliver.

Required actions

  1. Link research, samples, product review, packaging, production, store and fulfilment gates.
  2. Name owners and actual lead times, including approval time.
  3. Move dependent work and revise cash when a prerequisite slips.
Review standard
The launch date reflects unresolved dependencies and capacity.

Working record

  • Milestone, owner and predecessor
  • Planned / actual date
  • Delay effect and revised cash action

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Paid acquisition cannot assume launch while the approved pack or product release is still pending.

Related requirements: 50, 56, 57, 59, 77

REQUIREMENT 95 / 100 · Operations owner

Weekly operating review

Use one review to connect commercial and operational decisions.

Required actions

  1. Compare planned and actual retained orders, sales, contribution, cash and stock.
  2. Review customer issues, test outcomes and upcoming commitments.
  3. Record decisions, owners, due dates and what changed in the forecast.
Review standard
The review ends with specific decisions and an updated cash or operating plan.

Working record

  • Week and plan versus actual
  • Causes, stock, cash and customer issues
  • Decisions, owners and due dates

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A sales shortfall caused by stock unavailability needs a different response from an offer-conversion problem.

REQUIREMENT 96 / 100 · Operations owner

Scope changes

Prevent new requests from silently changing fees and dates.

Required actions

  1. Describe the requested change and why it is needed.
  2. Assess effects on outputs, revisions, cost, dependencies and timeline.
  3. Obtain the authorised decision before starting and retain the baseline and new version.
Review standard
The revised commitment is approved and can be compared with the original scope.

Working record

  • Change and reason
  • Cost, scope and schedule impact
  • Approver, decision and effective version

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

Adding another product variant is assessed for sourcing, testing, artwork and inventory effects.

REQUIREMENT 97 / 100 · Operations owner

Shared client portal

Specify authenticated collaboration separately from local planning.

Required actions

  1. Define project membership and role-based access for founder, team, specialist and viewer.
  2. Require server-side authorisation, project isolation, version history, protected files and attributable approvals.
  3. Test invitation, revocation, recovery, backup and audit retention before enabling real client collaboration.
Review standard
A live authenticated service passes access and collaboration tests; local records alone do not satisfy this requirement.

Working record

  • Roles and access matrix
  • Security / collaboration acceptance tests
  • Hosting, identity, deployment and reviewer

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

This edition saves on one browser. Shared accounts, cloud sync and authenticated approvals are not enabled.

REQUIREMENT 98 / 100 · Operations owner

Milestone acceptance

Connect delivery evidence to the agreed commercial gate.

Required actions

  1. List the exact deliverable version and acceptance criteria.
  2. Record the authorised reviewer, requested changes and acceptance evidence.
  3. Track invoice or payment status separately; do not treat a local checkbox as a signature.
Review standard
The accepted output and approving person are identifiable from real evidence.

Working record

  • Milestone and deliverable version
  • Acceptance evidence / required changes
  • Authorised approver and payment status

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A weekly report may be delivered while the product-release milestone remains unaccepted.

Related requirements: 26, 27, 34

REQUIREMENT 99 / 100 · Operations owner

Issue and decision history

Retain the reasoning behind changes to the business.

Required actions

  1. Record the issue, date, financial or customer exposure and evidence.
  2. Name the decision owner, options, deadline and chosen response.
  3. Close only after checking the result; retain reopened issues and superseded decisions.
Review standard
The history explains what changed, why and whether the response worked.

Working record

  • Issue and exposure
  • Options, decision, owner and due date
  • Resolution evidence and follow-up

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A supplier delay decision records the extra cash requirement and the customer promise affected.

REQUIREMENT 100 / 100 · Operations owner

Handover and exit

Leave the founder able to operate the business after the engagement.

Required actions

  1. Transfer the agreed accounts, source files, supplier records, SOPs and approved work.
  2. Verify access and recovery with the receiving owner; revoke access that is no longer required.
  3. List open issues, licences, renewals, commitments and the next operating plan.
Review standard
The recipient can access and use the agreed assets and accepts the outstanding obligations.

Working record

  • Asset / SOP and receiving owner
  • Transfer, access and recovery check
  • Open issues, commitments and next plan

Add a record title, reference, version and date. Assign an owner and due date. Retain review evidence, reviewer, status and open issues.

Practical example / note

A folder link is incomplete handover if the brand cannot edit source files or recover its domain.

Related requirements: 30, 96, 98, 99